Modeled biomass cordwood project

Capital cost: $395,365

Lifetime energy cost savings: $501,256

Net lifetime savings: $105,891

Benefit-cost ratio: 1.3

Proposed max capacity: 637,160 mmbtu/hr

Area heated: 11,753 sqft

Fuel consumed per year: 96 cords

This component calculates the potential change in heating oil usage from the installation of new cordwood boilers in non-residential buildings (assumed to heat 30% of non-residential square footage).