Technology/Project | NPV benefits | NPV cost | NPV net benefit | Benefit cost ratio | Levelized cost of energy: electricity ($/kwh) |
Levelized cost of energy: heating oil ($/gal) |
Gallons fuel saved per year |
---|---|---|---|---|---|---|---|
Wind Power (Modeled) | N/A | N/A | N/A | N/A | N/A | N/A | N/A |
Solar Power | $36,924 | $58,858 | $-21,934 | 0.6 | $0.75 | N/A | 602 |
Hydropower: Alatna/ Allakaket (unnamed creek 2.5 mi S of) -- Unnamed Creek | $1,245,633 | $3,861,449 | $-2,615,816 | 0.3 | $0.92 | N/A | 14,020 |
Hydropower: Allakaket (unnamed stream NW) -- Unnamed Creek | $74,482 | $10,671,483 | $-10,597,000 | 0.0 | $1.95 | N/A | 18,104 |
Transmission and Interties | N/A | N/A | N/A | N/A | N/A | N/A | N/A |
Diesel Efficiency | $409,649 | $2,368,141 | $-1,958,492 | 0.2 | $0.27 | N/A | 4,837 |
Cost effective projects have a benefit cost ratio greater than 1.0.