Waste Heat Recovery Operational: True
Identified as priority by HR working group: UNKNOWN
Est. current annual heating fuel gallons displaced: unknown
Capital cost: $763,676
Lifetime energy cost savings: $1,314,857
Net lifetime savings: $551,182
Benefit-cost ratio: 1.7
Est. potential annual heating fuel gallons displaced: 14,837 gallons
Number of buildings to be connected: 2
Round-trip distance of piping: 1,100 ft
Source: link
Notes: Design complete. Construction 2017 - water treatment plant. Washeteria not in the scope. No marine jackets. Could be potential expansion if loads materialize.