See: Generation for more details of the current generation systems
Modeled transmission project
Capital cost (total): $7,154,408
Capital cost (cost per mile): $500,000/mile
Lifetime energy cost savings: $-3,172,778
Net lifetime savings: $-10,327,186
Benefit-cost ratio: -0.4
Nearest community: Chignik
Distance: 14 miles
Maximum savings: $0.31/kWh
This component calculates the potential cost savings through changes in the amount of diesel fuel used for electricity generation from connecting communities via transmission lines.