See: Generation for more details of the current generation systems
Modeled transmission project
Capital cost (total): $10,052,918
Capital cost (cost per mile): $500,000/mile
Lifetime energy cost savings: $-17,380,764
Net lifetime savings: $-27,433,682
Benefit-cost ratio: -1.7
Nearest community: Nunam Iqua
Distance: 20 miles
Maximum savings: $0.04/kWh
This component calculates the potential cost savings through changes in the amount of diesel fuel used for electricity generation from connecting communities via transmission lines.