White mountain (eagle creek)

Present value of capital cost: $28,622,672

Lifetime energy cost savings: $-3,265,128

Net lifetime savings: $-31,887,801

Benefit-cost ratio: -0.1

Proposed nameplate capacity: 200 kW

Expected yearly generation: 690,221 kWh/year

Phase: Reconnaissance

Upfront capital cost: $29,140,234

Estimated hydro penetration level: 73.32%

source: link

Golovin (east tributary and upper cheenik creek) -- Cheenik Creek, Upper

Present value of capital cost: $21,622,870

Lifetime energy cost savings: $-3,302,463

Net lifetime savings: $-24,925,333

Benefit-cost ratio: -0.2

Proposed nameplate capacity: 164 kW

Expected yearly generation: 392,000 kWh/year

Phase: Reconnaissance

Upfront capital cost: $22,013,860

Estimated hydro penetration level: 41.64%

source: link

This component calculates the potential cost savings through changes in the amount of diesel fuel used for electricity generation from the installation of new hydropower infrastructure. Requires that at least a reconnaissance-level hydropower study has been completed for the community.