Important message
This community is known to have missing/incomplete data.

Modeled biomass cordwood project

Capital cost: N/A

Lifetime energy cost savings: N/A

Net lifetime savings: N/A

Benefit-cost ratio: N/A

Proposed max capacity: 191,422 mmbtu/hr

Area heated: 3,455 sqft

Fuel consumed per year: 28 cords

This component calculates the potential change in heating oil usage from the installation of new cordwood boilers in non-residential buildings (assumed to heat 30% of non-residential square footage).