Modeled biomass cordwood project

Capital cost: $1,186,094

Lifetime energy cost savings: $326,373

Net lifetime savings: $-859,722

Benefit-cost ratio: 0.3

Proposed max capacity: 2,108,382 mmbtu/hr

Area heated: 32,365 sqft

Fuel consumed per year: 313 cords

This component calculates the potential change in heating oil usage from the installation of new cordwood boilers in non-residential buildings (assumed to heat 30% of non-residential square footage).