See: Generation for more details of the current generation systems
Modeled transmission project
Capital cost (total): $3,548,146
Capital cost (cost per mile): $500,000/mile
Lifetime energy cost savings: $-1,624,148
Net lifetime savings: $-5,172,294
Benefit-cost ratio: -0.5
Nearest community: Bethel
Distance: 7 miles
Maximum savings: $0.18/kWh
This component calculates the potential cost savings through changes in the amount of diesel fuel used for electricity generation from connecting communities via transmission lines.