Technology/Project | NPV benefits | NPV cost | NPV net benefit | Benefit cost ratio | Levelized cost of energy: electricity ($/kwh) |
Levelized cost of energy: heating oil ($/gal) |
Gallons fuel saved per year |
---|---|---|---|---|---|---|---|
Wind Power (Modeled) | $711,064 | $2,677,329 | $-1,966,265 | 0.3 | $0.71 | N/A | 22,281 |
Solar Power | $55,833 | $164,145 | $-108,313 | 0.3 | $0.73 | N/A | 1,771 |
Hydropower: Mentasta Lake (right tributary of Slana River) -- Slana River, Tributary | $-1,361,323 | $11,549,045 | $-12,910,368 | -0.1 | $2.44 | N/A | 16,108 |
Hydropower: Carlson Creek | $2,377,227 | $24,582,054 | $-22,204,826 | 0.1 | $1.02 | N/A | 82,705 |
Transmission and Interties | N/A | N/A | N/A | N/A | N/A | N/A | N/A |
Diesel Efficiency | $543,197 | $2,913,221 | $-2,370,024 | 0.2 | $0.16 | N/A | 9,279 |
Cost effective projects have a benefit cost ratio greater than 1.0.