Average community load (2013): 154 kW
Average generation (2013): 1,349,438 kWh/year
Peak load: Unknown
Existing nameplate wind capacity: 0 kW
Existing wind generation (2013): 0 kWh/year
Estimated proposed wind generation: 0 kWh/year
Existing nameplate solar capacity: 0 kW
Existing solar generation (2013): 0 kWh/year
Estimated proposed solar generation: 18,739 kWh/year
Existing nameplate hydro capacity : 0 kW
Existing hydro generation (2013): 0 kWh/year
Estimated proposed hydro generation: 0 kWh/year
Mentasta lake (right tributary of slana river) -- Slana River, Tributary
Capital cost: $14,294,691
Lifetime savings: $-1,086,827
Net lifetime savings: $-15,381,518
Benefit-cost ratio: -0.1
Proposed nameplate capacity: 84 kW
Expected yearly generation: 287,000 kWh/year
Phase: Reconnaissance
Total capital cost: $11,757,878
Estimated hydro penetration level: 21.27%
source: link
Carlson creek
Capital cost: $30,426,139
Lifetime savings: $2,264,356
Net lifetime savings: $-28,161,783
Benefit-cost ratio: 0.1
Proposed nameplate capacity: 325 kW
Expected yearly generation: 1,473,622 kWh/year
Phase: Feasibility
Total capital cost: $25,026,552
Estimated hydro penetration level: 109.20%