Current system

See: Generation for more details of the current generation systems

Modeled transmission project

Capital cost (total): $9,479,736

Capital cost (cost per mile): $500,000/mile

Lifetime energy cost savings: $-431,722

Net lifetime savings: $-9,911,458

Benefit-cost ratio: -0.0

Nearest community: King Cove

Distance: 19 miles

Maximum savings: $0.41/kWh

This component calculates the potential cost savings through changes in the amount of diesel fuel used for electricity generation from connecting communities via transmission lines.