Current system

See: Generation for more details of the current generation systems

Eagle (eagle village, american creek)

Present value of capital cost: $12,009,155

Lifetime energy cost savings: $-2,125,263

Net lifetime savings: $-14,134,418

Benefit-cost ratio: -0.2

Proposed nameplate capacity: 59 kW

Expected yearly generation: 207,000 kWh/year

Phase: Reconnaissance

Upfront capital cost: $12,226,307

Estimated hydro penetration level: 28.76%

source: link

This component calculates the potential cost savings through changes in the amount of diesel fuel used for electricity generation from the installation of new hydropower infrastructure. Requires that at least a reconnaissance-level hydropower study has been completed for the community.