Current system

Waste Heat Recovery Operational: False

Identified as priority by HR working group: UNKNOWN

Est. current annual heating fuel gallons displaced: unknown

Glennallen, alaska heat recovery study

Capital cost: $1,514,118

Lifetime energy cost savings: $4,595,392

Net lifetime savings: $3,081,274

Benefit-cost ratio: 3.0

Est. potential annual heating fuel gallons displaced: 69,839 gallons

Number of buildings to be connected: 2

Round-trip distance of piping: 6,000 ft

Source: link

Notes: Allison Creek in operation. Revisit in 2017 to understand winter power generation.

This component calculates the potential change in heating oil usage from the installation of a new or upgraded heat recovery system to service non-residential buildings. Requires that at least a reconnaissance-level heat recovery study has been completed for the community.