Current system

Waste Heat Recovery Operational: False

Identified as priority by HR working group: UNKNOWN

Est. current annual heating fuel gallons displaced: unknown

Holy cross power plant heat recovery for water distribution system

Capital cost: $519,758

Lifetime energy cost savings: $383,680

Net lifetime savings: $-136,078

Benefit-cost ratio: 0.7

Est. potential annual heating fuel gallons displaced: 3,800 gallons

Number of buildings to be connected: 2

Round-trip distance of piping: 1,400 ft

Source: link

Notes: in design - RACEE and USDA funding.

This component calculates the potential change in heating oil usage from the installation of a new or upgraded heat recovery system to service non-residential buildings. Requires that at least a reconnaissance-level heat recovery study has been completed for the community.