See: Generation for more details of the current generation systems
Modeled transmission project
Capital cost (total): $8,525,310
Capital cost (cost per mile): $500,000/mile
Lifetime energy cost savings: $-8,505,960
Net lifetime savings: $-17,031,270
Benefit-cost ratio: -1.0
Nearest community: Chevak
Distance: 17 miles
Maximum savings: $0.05/kWh
This component calculates the potential cost savings through changes in the amount of diesel fuel used for electricity generation from connecting communities via transmission lines.