Modeled biomass cordwood project

Capital cost: $11,070,215

Lifetime energy cost savings: $10,689,867

Net lifetime savings: $-380,349

Benefit-cost ratio: 1.0

Proposed max capacity: 18,362,477 mmbtu/hr

Area heated: 629,895 sqft

Fuel consumed per year: 3,483 cords

This component calculates the potential change in heating oil usage from the installation of new cordwood boilers in non-residential buildings (assumed to heat 30% of non-residential square footage).