See: Generation for more details of the current generation systems
Modeled transmission project
Capital cost (total): $13,426,243
Capital cost (cost per mile): $500,000/mile
Lifetime energy cost savings: $-9,878,841
Net lifetime savings: $-23,305,084
Benefit-cost ratio: -0.7
Nearest community: Pilot Station
Distance: 26 miles
Maximum savings: $0.01/kWh
This component calculates the potential cost savings through changes in the amount of diesel fuel used for electricity generation from connecting communities via transmission lines.