Current system

See: Generation for more details of the current generation systems

Modeled transmission project

Capital cost (total): $13,426,243

Capital cost (cost per mile): $500,000/mile

Lifetime energy cost savings: $-9,878,841

Net lifetime savings: $-23,305,084

Benefit-cost ratio: -0.7

Nearest community: Pilot Station

Distance: 26 miles

Maximum savings: $0.01/kWh

This component calculates the potential cost savings through changes in the amount of diesel fuel used for electricity generation from connecting communities via transmission lines.