Technology/Project | NPV benefits | NPV cost | NPV net benefit | Benefit cost ratio | Levelized cost of energy: electricity ($/kwh) |
Levelized cost of energy: heating oil ($/gal) |
Gallons fuel saved per year |
---|---|---|---|---|---|---|---|
Wind Power (Modeled) | N/A | N/A | N/A | N/A | N/A | N/A | N/A |
Solar Power | N/A | N/A | N/A | N/A | N/A | N/A | N/A |
Hydropower: Iliamna (unnamed stream, site #1) -- Unnamed Creek | $-564,545 | $3,321,931 | $-3,886,476 | -0.2 | $4.40 | N/A | 2,259 |
Transmission and Interties | N/A | N/A | N/A | N/A | N/A | N/A | N/A |
Diesel Efficiency | $23,445 | $1,882,505 | $-1,859,060 | 0.0 | $2.90 | N/A | 317 |
Cost effective projects have a benefit cost ratio greater than 1.0.