See: Generation for more details of the current generation systems
Modeled transmission project
Capital cost (total): $12,239,450
Capital cost (cost per mile): $500,000/mile
Lifetime energy cost savings: $-7,110,231
Net lifetime savings: $-19,349,681
Benefit-cost ratio: -0.6
Nearest community: Nondalton
Distance: 24 miles
Maximum savings: $0.09/kWh
This component calculates the potential cost savings through changes in the amount of diesel fuel used for electricity generation from connecting communities via transmission lines.