Modeled transmission project

Capital cost (total): $10,864,662

Capital cost (cost per mile): $500,000/mile

Lifetime energy cost savings: $-7,577,725

Net lifetime savings: $-18,442,386

Benefit-cost ratio: -0.7

Nearest community: Chevak

Distance: 21 miles

Maximum savings: $0.11/kWh

This component calculates the potential cost savings through changes in the amount of diesel fuel used for electricity generation from connecting communities via transmission lines.