See: Generation for more details of the current generation systems
Modeled transmission project
Capital cost (total): $10,864,662
Capital cost (cost per mile): $500,000/mile
Lifetime energy cost savings: $-7,577,725
Net lifetime savings: $-18,442,386
Benefit-cost ratio: -0.7
Nearest community: Chevak
Distance: 21 miles
Maximum savings: $0.11/kWh
This component calculates the potential cost savings through changes in the amount of diesel fuel used for electricity generation from connecting communities via transmission lines.