Modeled biomass cordwood project

Capital cost: $790,730

Lifetime energy cost savings: $291,858

Net lifetime savings: $-498,871

Benefit-cost ratio: 0.4

Proposed max capacity: 1,179,985 mmbtu/hr

Area heated: 46,265 sqft

Fuel consumed per year: 193 cords

This component calculates the potential change in heating oil usage from the installation of new cordwood boilers in non-residential buildings (assumed to heat 30% of non-residential square footage).