Current system

See: Generation for more details of the current generation systems

Modeled transmission project

Capital cost (total): $12,927,043

Capital cost (cost per mile): $500,000/mile

Lifetime energy cost savings: $-6,939,618

Net lifetime savings: $-19,866,661

Benefit-cost ratio: -0.5

Nearest community: Kwethluk

Distance: 26 miles

Maximum savings: $0.08/kWh

This component calculates the potential cost savings through changes in the amount of diesel fuel used for electricity generation from connecting communities via transmission lines.