Current system

See: Generation for more details of the current generation systems

Modeled transmission project

Capital cost (total): $13,591,489

Capital cost (cost per mile): $500,000/mile

Lifetime energy cost savings: $-8,263,114

Net lifetime savings: $-21,854,603

Benefit-cost ratio: -0.6

Nearest community: Diomede

Distance: 27 miles

Maximum savings: $0.09/kWh

This component calculates the potential cost savings through changes in the amount of diesel fuel used for electricity generation from connecting communities via transmission lines.