Modeled transmission project
Capital cost (total): $10,137,560
Capital cost (cost per mile): $500,000/mile
Lifetime energy cost savings: $-7,948,940
Net lifetime savings: $-18,086,500
Benefit-cost ratio: -0.8
Nearest community: Bethel
Distance: 20 miles
Maximum savings: $0.11/kWh
This component calculates the potential cost savings through changes in the amount of diesel fuel used for electricity generation from connecting communities via transmission lines.