Current system

See: Generation for more details of the current generation systems

Modeled transmission project

Capital cost (total): $13,750,748

Capital cost (cost per mile): $500,000/mile

Lifetime energy cost savings: $-7,514,481

Net lifetime savings: $-21,265,229

Benefit-cost ratio: -0.5

Nearest community: Lower Kalskag

Distance: 27 miles

Maximum savings: $0.14/kWh

This component calculates the potential cost savings through changes in the amount of diesel fuel used for electricity generation from connecting communities via transmission lines.