See: Generation for more details of the current generation systems
Modeled transmission project
Capital cost (total): $13,750,748
Capital cost (cost per mile): $500,000/mile
Lifetime energy cost savings: $-7,514,481
Net lifetime savings: $-21,265,229
Benefit-cost ratio: -0.5
Nearest community: Lower Kalskag
Distance: 27 miles
Maximum savings: $0.14/kWh
This component calculates the potential cost savings through changes in the amount of diesel fuel used for electricity generation from connecting communities via transmission lines.