Current system

See: Generation for more details of the current generation systems

Modeled transmission project

Capital cost (total): $2,709,916

Capital cost (cost per mile): $500,000/mile

Lifetime energy cost savings: $1,102,438

Net lifetime savings: $-1,607,478

Benefit-cost ratio: 0.4

Nearest community: Chignik

Distance: 5 miles

Maximum savings: $0.20/kWh

This component calculates the potential cost savings through changes in the amount of diesel fuel used for electricity generation from connecting communities via transmission lines.