See: Generation for more details of the current generation systems
Modeled transmission project
Capital cost (total): $2,709,916
Capital cost (cost per mile): $500,000/mile
Lifetime energy cost savings: $1,102,438
Net lifetime savings: $-1,607,478
Benefit-cost ratio: 0.4
Nearest community: Chignik
Distance: 5 miles
Maximum savings: $0.20/kWh
This component calculates the potential cost savings through changes in the amount of diesel fuel used for electricity generation from connecting communities via transmission lines.