Current system

See: Generation for more details of the current generation systems

False pass hydroelectric feasibility study and conceptual design

Present value of capital cost: $4,518,299

Lifetime energy cost savings: $1,874,291

Net lifetime savings: $-2,644,008

Benefit-cost ratio: 0.4

Proposed nameplate capacity: 125 kW

Expected yearly generation: 540,000 kWh/year

Phase: Feasibility

Upfront capital cost: $4,600,000

Estimated hydro penetration level: 83.45%

source: link

This component calculates the potential cost savings through changes in the amount of diesel fuel used for electricity generation from the installation of new hydropower infrastructure. Requires that at least a reconnaissance-level hydropower study has been completed for the community.