Modeled biomass cordwood project

Capital cost: $593,047

Lifetime energy cost savings: $585,946

Net lifetime savings: $-7,101

Benefit-cost ratio: 1.0

Proposed max capacity: 1,012,586 mmbtu/hr

Area heated: 21,937 sqft

Fuel consumed per year: 153 cords

This component calculates the potential change in heating oil usage from the installation of new cordwood boilers in non-residential buildings (assumed to heat 30% of non-residential square footage).