Modeled biomass cordwood project

Capital cost: $69,781,891

Lifetime energy cost savings: $41,963,649

Net lifetime savings: $-27,818,242

Benefit-cost ratio: 0.6

Proposed max capacity: 114,764,007 mmbtu/hr

Area heated: 3,148,131 sqft

Fuel consumed per year: 18,768 cords

This component calculates the potential change in heating oil usage from the installation of new cordwood boilers in non-residential buildings (assumed to heat 30% of non-residential square footage).