See: Generation for more details of the current generation systems
Modeled transmission project
Capital cost (total): $15,598,041
Capital cost (cost per mile): $500,000/mile
Lifetime energy cost savings: $-11,632,242
Net lifetime savings: $-27,230,283
Benefit-cost ratio: -0.7
Nearest community: Kipnuk
Distance: 31 miles
Maximum savings: $0.18/kWh
This component calculates the potential cost savings through changes in the amount of diesel fuel used for electricity generation from connecting communities via transmission lines.