Modeled transmission project
Capital cost (total): $14,756,203
Capital cost (cost per mile): $500,000/mile
Lifetime energy cost savings: $-15,214,101
Net lifetime savings: $-29,970,303
Benefit-cost ratio: -1.0
Nearest community: Pilot Station
Distance: 29 miles
Maximum savings: $0.02/kWh
This component calculates the potential cost savings through changes in the amount of diesel fuel used for electricity generation from connecting communities via transmission lines.