Current system

See: Generation for more details of the current generation systems

Modeled transmission project

Capital cost (total): $9,682,244

Capital cost (cost per mile): $500,000/mile

Lifetime energy cost savings: $-10,684,661

Net lifetime savings: $-20,366,905

Benefit-cost ratio: -1.1

Nearest community: Koliganek

Distance: 19 miles

Maximum savings: $0.15/kWh

This component calculates the potential cost savings through changes in the amount of diesel fuel used for electricity generation from connecting communities via transmission lines.