Current system

See: Generation for more details of the current generation systems

Modeled transmission project

Capital cost (total): $3,012,216

Capital cost (cost per mile): $500,000/mile

Lifetime energy cost savings: $342,164

Net lifetime savings: $-2,670,052

Benefit-cost ratio: 0.1

Nearest community: Brevig Mission

Distance: 6 miles

Maximum savings: $0.07/kWh

This component calculates the potential cost savings through changes in the amount of diesel fuel used for electricity generation from connecting communities via transmission lines.