See: Generation for more details of the current generation systems
Modeled transmission project
Capital cost (total): $3,012,216
Capital cost (cost per mile): $500,000/mile
Lifetime energy cost savings: $342,164
Net lifetime savings: $-2,670,052
Benefit-cost ratio: 0.1
Nearest community: Brevig Mission
Distance: 6 miles
Maximum savings: $0.07/kWh
This component calculates the potential cost savings through changes in the amount of diesel fuel used for electricity generation from connecting communities via transmission lines.