See: Generation for more details of the current generation systems
Modeled transmission project
Capital cost (total): $5,965,258
Capital cost (cost per mile): $250,000/mile
Lifetime energy cost savings: $-5,825,057
Net lifetime savings: $-11,790,315
Benefit-cost ratio: -1.0
Nearest community: Gustavus
Distance: 24 miles
Maximum savings: $0.27/kWh
This component calculates the potential cost savings through changes in the amount of diesel fuel used for electricity generation from connecting communities via transmission lines.