Current system

See: Generation for more details of the current generation systems

Modeled transmission project

Capital cost (total): $14,099,633

Capital cost (cost per mile): $500,000/mile

Lifetime energy cost savings: $-9,198,052

Net lifetime savings: $-23,297,685

Benefit-cost ratio: -0.7

Nearest community: Chignik Lake

Distance: 28 miles

Maximum savings: $0.09/kWh

This component calculates the potential cost savings through changes in the amount of diesel fuel used for electricity generation from connecting communities via transmission lines.