Modeled biomass cordwood project

Capital cost: $7,511,932

Lifetime energy cost savings: $5,004,995

Net lifetime savings: $-2,506,937

Benefit-cost ratio: 0.7

Proposed max capacity: 12,331,917 mmbtu/hr

Area heated: 328,934 sqft

Fuel consumed per year: 2,017 cords

This component calculates the potential change in heating oil usage from the installation of new cordwood boilers in non-residential buildings (assumed to heat 30% of non-residential square footage).