Current system

Waste Heat Recovery Operational: True

Identified as priority by HR working group: UNKNOWN

Est. current annual heating fuel gallons displaced: unknown

Togiak waste heat recovery project

Capital cost: $492,868

Lifetime energy cost savings: $1,042,238

Net lifetime savings: $549,370

Benefit-cost ratio: 2.1

Est. potential annual heating fuel gallons displaced: 13,700 gallons

Number of buildings to be connected: 2

Round-trip distance of piping: 1,200 ft

Source: link

Notes: Funding through the RE Fund for design and construction - Togiak is responsible for the project. Funded for new pp through Denali Commission. Design in progress.

This component calculates the potential change in heating oil usage from the installation of a new or upgraded heat recovery system to service non-residential buildings. Requires that at least a reconnaissance-level heat recovery study has been completed for the community.